|
Western Hemisphere |
|
USA, Houston, Hempstead |
|
USA, Houston, Eldridge |
|
USA, New Orleans |
|
Brazil, Macaé |
|
|
|
Eastern Hemisphere |
|
Aberdeen, Scotland |
|
England, London |
|
Norway, Stavanger |
| |
Denmark, Esbjerg |
| |
Netherlands, Beverwijk |
| |
Nigeria, Port Harcourt |
| |
Egypt, Cairo |
| |
Egypt, Alexandria |
| |
|
|
Asia-Pacific |
| |
Singapore |
|
Malaysia, Kuala Lumpur |
| |
Indonesia, Jakarta |
| |
Australia, Perth (Sales) |
| |
Australia, Perth (Operations) |
| |
China, Shekou |
| |
China, Tianjin |
| |
|
| |
|
|
|
Download Quicktime Player |
SINGLEBORE™ PRODUCTION SYSTEM
Dril-Quip's SingleBore Production System is a time-saving, economical alternative to traditional completion system design. The SingleBore Production System eliminates the need to run and retrieve a wireline plug to open and close the annulus.
|
| • |
Workover riser system and surface tree are simpler and less expensive than systems for traditional dual bore trees |
| • |
Can be run on tubing or drill pipe with an umbilical |
| • |
Flow through the tree to and from the annulus occurs in a series of connected bores and an 1" O.D. high pressure line run with the workover control umbilical |
| • |
The SingleBore Tree and Tree Cap Running and Retrieving Tool replace an expensive lower riser package and an emergency disconnect system |
| • |
The SingleBore Tree body incorporates integral production master and production swab valves, and an annulus master valve |
| |
|
SB-Plugs™ and Tubing Hanger Features |
| • |
Dril-Quip's patented, in-series, dual SB Plugs provide reliable positive annulus shutoff |
| • |
Tubing Hanger available for standard or H2S service |
| • |
Tubing sizes up to 7" can be accommodated while maintaining a full 2" annulus access |
| |
|
| |
|
|
|
|