|
Western Hemisphere |
|
USA, Houston, Hempstead |
|
USA, Houston, Eldridge |
|
USA, New Orleans |
|
Brazil, Macaé |
|
|
|
Eastern Hemisphere |
|
Aberdeen, Scotland |
|
England, London |
|
England, Great Yarmouth |
| |
Norway, Stavanger |
| |
Denmark, Esbjerg |
| |
Netherlands, Beverwijk |
| |
Nigeria, Lagos |
| |
Nigeria, Port Harcourt |
| |
Egypt, Cairo |
| |
Egypt, Alexandria |
| |
|
|
Asia-Pacific |
| |
Singapore |
| |
Malaysia, Kuala Lumpur |
| |
Indonesia, Jakarta |
| |
Australia, Perth |
| |
Australia, Darwin |
| |
China, Shekou |
| |
China, Tianjin |
| |
|
| |
|
|
|
MS-10® MUDLINE SUSPENSION
The MS-10 Mudline Suspension System is a field-proven system of hangers that support the weight of each casing string at the mudline. The MS-10 is an economic alternative to the full-featured MS-15® Mudline Suspension System where anticipated well pressure does not exceed 10,000 psi.
|
| • |
Easy handling, trouble-free operation |
| • |
Single trip running and setting of hangers |
| • |
Large flow-by areas |
| • |
Profile clean-out tool available |
| • |
Positive backup of split-ring hangers |
| • |
Hangers automatically centralized when landed |
| • |
Metal-to-metal sealing on production tie-back tools |
| • |
Temporary abandonment caps available |
| • |
Tie-back tools available |
| • |
High load capacity |
| • |
Field-proven performance |
|
|
|