|
Western Hemisphere |
|
USA, Houston, Hempstead |
|
USA, Houston, Eldridge |
|
USA, New Orleans |
|
Brazil, Macaé |
|
|
|
Eastern Hemisphere |
|
Aberdeen, Scotland |
|
England, London |
|
England, Great Yarmouth |
| |
Norway, Stavanger |
| |
Denmark, Esbjerg |
| |
Netherlands, Beverwijk |
| |
Nigeria, Lagos |
| |
Nigeria, Port Harcourt |
| |
Egypt, Cairo |
| |
Egypt, Alexandria |
| |
|
|
Asia-Pacific |
| |
Singapore |
| |
Malaysia, Kuala Lumpur |
| |
Indonesia, Jakarta |
| |
Australia, Perth |
| |
Australia, Darwin |
| |
China, Shekou |
| |
China, Tianjin |
| |
|
| |
|
|
|
GUIDELINELESS SUBEA PRODUCTION SYSTEM
Dril-Quip's Guidelineless Subsea Production System's design incorporates the latest in deepwater completion technology. All Dril-Quip trees (SingleBore™, Horizontal and Dual Bore) can be designed and configured to accommodate guidelineless completion operations.
|
| • |
Guidelineless flowline connection system can be lay-away, pull-in or jumper spool |
| • |
Optional special purpose completion guidebase can incorporate connection point for flowline and control umbilical |
| • |
Optional tubing spool available for manufacturer-to-manufacturer crossover and/or side outlet annulus access |
| • |
Includes all associated tools necessary including Emergency Disconnect Packages (EDP), Lower Riser Packages (LRP), completion riser and installation workover control system |
| • |
Can be run on mono-bore completion riser with a wireline bore selector |
| • |
Compatible with electro-hydraulic and/or multiplex production control systems |
| • |
Can interface with any manufacturer's completion riser, LRP and EDP |
| • |
Can be equipped with multiple ROV (Remote Operating Vehicle) interfaces |
| • |
Gate valve actuators rated for 6,000 feet of water standard; optional actuators rated to 10,000 feet of water available upon request |
| • |
Manufactured to industry standards and customer specifications |
| • |
Field-proven performance |
|
|
|